TAG

#public works

1 article
The Lake Delia promenade in Ungheni, with grey paving laid along the water and, next to it, strips of still unfinished gravel edged by kerbs, under an overcast sky
LOCAL

Ungheni's lakeside promenade on Lake Delia, over 470 metres long, is now paved. Cycle lanes and green areas come next

Paving has been laid on the promenade of more than 470 metres along Lake Delia, the Ungheni City Hall says. Pedestrian areas, cycle lanes, green spaces and spots for trade are still to come. The contract with the company Balt-Cons is worth 5,759,683 lei including VAT, and Cluj-Napoca's share is transferred after the works are formally accepted.

Ion Calmis·20 October 2026· News
1/3 · reporting underway· got a tip? write to us →